(!) Since support from Microsoft will end on January 14th, 2020, Windows 7 will be excluded from the recommended environment from December 15th, 2019 on this site. Vì lý do Microsoft kết thúc hỗ trợ cho Windows 7 vào ngày 14/01/2020, Windows 7 sẽ là hệ điều hành không được khuyến khích sử dụng với trang web này từ ngày 15/12/2019.
Select part number to Order Now/ Add to Cart
[Features]
▪ U-bolt for SGP tubes, copper tubes, stainless steel thin-walled tubes (SU Molar pipe), and electrical insulation.
▪ Nylon powder coating type.
▪ Nylon powder coating type with excellent electrical insulation and shock resistance properties.
▪ Heat resistance room temperature 100°C. (No abnormalities in data for test conducted under 150°C for 24 hours)
· U-bolt is zinc finished.
▪ Plate is made of Polypropylene.
Part Number |
---|
A12114-0112 |
Part Number | Price | Minimum Order Qty. | Volume Discount | Days to ShipSố ngày giao hàng | Main fit tube(or application tube)outside diameter (mm) | Applicable Pipe Type | Size | Compatible Pipe Outer Diameter (mm) | Color |
---|---|---|---|---|---|---|---|---|---|
567,351 VND | 1 Piece(s) | 14 Day(s) or more | 100~Less than 200 | [Steel Pipe / Coated Steel Pipe] SGP Pipe | SG-125 | 139.8 | Ivory |
Loading...Tải…
Type | U-Bolt | Material | Steel | Surface Treatment | Electrolytic Zinc Plating |
---|---|---|---|---|---|
Qty.(piece) | 1 |
Please check the type/dimensions/specifications of the part A12114-0112 in the U-Shaped Bracket NC-U Bolt (SG / CU / SU) series.Vui lòng kiểm tra kiểu/kích thước/thông số kỹ thuật của phần A12114-0112 trong chuỗi U-Shaped Bracket NC-U Bolt (SG / CU / SU).
Part Number |
---|
A12113-0050 |
A12113-0064 |
A12113-0079 |
A12114-0127 |
A12114-0131 |
A12115-0016 |
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to ShipSố ngày giao hàng | Main fit tube(or application tube)outside diameter (mm) | Applicable Pipe Type | Size | Compatible Pipe Outer Diameter (mm) | Color |
---|---|---|---|---|---|---|---|---|---|
80,093 VND | 1 Piece(s) | 13 Day(s) or more | 10~Less than 20 | Copper Pipe | CU-19 | 19.05 | Black | ||
75,311 VND | 1 Piece(s) | 7 Day(s) or more | 20~Less than 30 | Copper Pipe | CU-20 | 22.22 | Black | ||
82,881 VND | 1 Piece(s) | 7 Day(s) or more | 20~Less than 30 | Copper Pipe | CU-5 | 25.4 | Black | ||
682,893 VND | 1 Piece(s) | 14 Day(s) or more | 100~Less than 200 | [Steel Pipe / Coated Steel Pipe] SGP Pipe | SG-150 | 165.2 | Ivory | ||
1,306,186 VND | 1 Piece(s) | 13 Day(s) or more | 200~Less than 300 | [Steel Pipe / Coated Steel Pipe] SGP Pipe | SG-200 | 216.3 | Ivory | ||
77,703 VND | 1 Piece(s) | 20 Day(s) or more | 10~Less than 20 | [Stainless Steel Pipe] Stainless Steel Thin Wall Tube | SU-13 | 15.88 | Blue |
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy