(!) Since support from Microsoft will end on January 14th, 2020, Windows 7 will be excluded from the recommended environment from December 15th, 2019 on this site. Vì lý do Microsoft kết thúc hỗ trợ cho Windows 7 vào ngày 14/01/2020, Windows 7 sẽ là hệ điều hành không được khuyến khích sử dụng với trang web này từ ngày 15/12/2019.
Select part number to Order Now/ Add to Cart
Caution
thận trọng
[Features]
A pipe fitting that uses screws to connect steel pipes of small to medium diameter, referred to in JIS B2301 as a "Screw-in type malleable cast iron pipe fitting".
Some non-JIS standard products are also produced.
· The main material is Mareburu® (blackheart malleable cast iron), the threaded portion has a taper pipe thread, and hot-dip galvanization is used if the surface is to be processed.
• Changed to hot-dip galvanization to reduce environmental burden (RoSH compliant).
Connecting Shape | 45° Female Male Elbow | Connection Type | Screw⇔Screw Same Diameter・Different Type | Material | FCMB27-05 |
---|---|---|---|---|---|
Connection Thread Type M1 | Rc | Connection Thread Type M2 | R | Applicable Fluid | Water / Air / Steam / Gas / Oil |
Type | Fitting | Max. Operating Pressure(MPa) | 2.5 | Divisions of Max. Operating Pressure | than 2.0Mpa |
Interior Resin Lining | No | Band | Presence |
Please check the type/dimensions/specifications of the part SL45-10A-W in the Pipe Fitting, 45° Female Male Elbow (With Clamp) series.Vui lòng kiểm tra kiểu/kích thước/thông số kỹ thuật của phần SL45-10A-W trong chuỗi Pipe Fitting, 45° Female Male Elbow (With Clamp).
Part Number |
---|
SL45-10A-B |
SL45-15A-B |
SL45-15A-W |
SL45-20A-B |
SL45-20A-W |
SL45-25A-B |
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to ShipSố ngày giao hàng | Nominal of Thread M1 | Nominal of Thread M2 | Surface Treatment |
---|---|---|---|---|---|---|---|
83,978 VND | 400 Piece(s) | 6 Day(s) or more | 3/8B(10A) | 3/8B(10A) | [Not Provided] No | ||
83,978 VND | 280 Piece(s) | 6 Day(s) or more | 1/2B(15A) | 1/2B(15A) | [Not Provided] No | ||
83,978 VND | 1 Piece(s) | 22 Day(s) or more | 1/2B(15A) | 1/2B(15A) | [Zinc Plating] Hot zinc plating | ||
105,891 VND | 140 Piece(s) | 6 Day(s) or more | 3/4B(20A) | 3/4B(20A) | [Not Provided] No | ||
110,315 VND | 1 Piece(s) | 4 Day(s) or more | 3/4B(20A) | 3/4B(20A) | [Zinc Plating] Hot zinc plating | ||
147,726 VND | 80 Piece(s) | 11 Day(s) or more | 1B(25A) | 1B(25A) | [Not Provided] No |
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy